Project Engineer, DC Construction, Data Center Construction
Amazon
Tailor my CV for this job, freeView job and applyYour CV rewritten for this role, from your real experience. Sign in with Google, nothing to install.
Got this interview? Our apps help you get the job.
Skills named in this job
Read from the description itself, not inferred.
This role on the market
571 open construction roles across 39 companies are on ApplySarthi right now, most of them in Hyderabad (6), Delhi NCR (5), Bengaluru (5).
- Engineering & Construction Senior Planner | MilanoPwc
- New College Grad - Category Supplier Manager, Construction Trades SourcingMicron
- Construction TraineeJll
- Construction ManagerJobgether
- Senior AI Engineer | Construction Tech (w/m/d)Right Search
What construction roles keep asking for: Excel (14%), AWS (13%) — counted across their open postings here.
Project Engineer jobs in the United States · AWS jobs
Amazon has 14,204 open roles listed here.
- Controls Technician, Controls Deployment & Service Indiahyderabad
- Applied Scientist II, RBS Techbengaluru
- Data Scientist II, EU Prime and Marketing Analytics & Science (PRIMAS)bengaluru
- Investigation SME, Flex Investigations and Offboardinghyderabad
- Investigation Specialist II, Flex Investigations and Offboardinghyderabad
Counted across 14 company job boards, updated as roles open and close.
Preparing for this interview
Interviews for construction roles keep coming back to Excel, AWS. Practise those questions before you sit with Amazon.
Questions you are likely to be asked
- Why do you want to join Amazon?
- What is your experience with AWS? Tell me one thing you learned the hard way.
- How would you design an API for a feature you have worked on?
- What do you do when a production issue happens on your code?
- Walk me through a system you built. How was it designed, and what would you change now?
Prep Sarthi gives you a free mock interview: an AI interviewer asks you questions like these out loud, from your own CV and this job, and shows your score and your weakest answer.
Practise the Project Engineer, DC Construction, Data Center Construction at Amazon interview free →AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers Basic qualifications: - Experience in construction or project management - 2+ years of data center or mission critical facilities (example: hospital, military facility, public safety facility, etc.) experience - 2+ years of electrical or mechanical engineering experience Preferred: - Experience in facilities management Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit https://amazon.jobs/content/en/how-we-hire/accommodations for more information. If the country/region you’re applying in isn’t listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at https://amazon.jobs/en/benefits . USA, LA, Shreveport - 86,400.00 - 149,700.00 USD annually USA, TX, Dallas - 96,000.00 - 166,300.00 USD annually
Match this job to your CV
ApplySarthi scores your CV against this role, shows the skills you are missing, and writes a tailored version for the application.
Check my match →Similar open roles
- Controls Engineer, Controls Deployment & Service IndiaAmazon · hyderabad
- AIT Audit Manager III, Audits and Insights TeamAmazon · hyderabad
- Sr. Software Development Engineer, AmazonAmazon · bengaluru
- Senior Financial Analyst, DEX FinanceAmazon · bengaluru
- ID-LB Cabling Infrastructure Tech, Data Center Operations Amazon · mumbai
- Recruiting Manager , Global Strategic SourcingAmazon · bengaluru
- Software Development Manager, Builder Foundations GRIDAmazon · bengaluru
- Applied Scientist, SSG ScienceAmazon · bengaluru
Need answers during your interview? Try Live Sarthi.
Live Sarthi, an Interview Sarthi app, shows answer suggestions during the call.
- Hidden from supported screen sharingThe overlay stays out of supported Windows screen captures.
- Answers start in about 1.5 secondsResponse time varies with your connection and model.
- From your own CVYour projects and your experience, not a generic script.
- 30 minutes freeThen ₹99 for a 2-day pass with unlimited calls — you pay for the days you are interviewing, not a subscription.
A Windows app, from the same team as ApplySarthi.
Listed on amazon · posted 2026-08-06. ApplySarthi collects openings and links to application pages; the role is advertised by Amazon, not by us.