Director, Data Center Construction - Saline, MI
Oracle
Tailor my CV for this job, freeView job and applyYour CV rewritten for this role, from your real experience. Sign in with Google, nothing to install.
Got this interview? Our apps help you get the job.
Skills named in this job
Read from the description itself, not inferred.
This role on the market
873 open construction roles across 60 companies are on ApplySarthi right now, most of them in Hyderabad (4), Delhi NCR (4), Ahmedabad (4).
- Design & Startup WHS PM, WHS Design, Construction & StartupAmazon
- Construction Management Associate IJPMorgan
- Principal Consultant – Safety Advisory (Construction & Workplace Safety) - London and South EastWSP
- Construction CSA EngineerMicron
- Sr Engineer - Construction Operations & GovernanceVerizon
What construction roles keep asking for: Stakeholder management (18%), Excel (18%), Supply chain (16%) — counted across their open postings here.
Oracle has 2,843 open roles listed here.
- Senior Network Developer
- Senior Network Developer
- Senior Software Engineer, Core Infrastructure
- Consulting Solution Director
- Principal Optical Engineer
Counted across 14 company job boards, updated as roles open and close.
Preparing for this interview
Interviews for construction roles keep coming back to Stakeholder management, Excel, Supply chain. Practise those questions before you sit with Oracle.
Questions you are likely to be asked
- Why do you want to join Oracle?
- What is your experience with Supply chain? Tell me one thing you learned the hard way.
- Tell me about yourself, and why this role is the right next step.
- Tell me about a problem you solved at work that you are proud of.
- Tell me about a time you disagreed with your manager. What happened?
Prep Sarthi gives you a free mock interview: an AI interviewer asks you questions like these out loud, from your own CV and this job, and shows your score and your weakest answer.
Practise the Director, Data Center Construction - Saline, MI at Oracle interview free →Lead construction execution for one of OCI’s most significant AI infrastructure programs in Saline, MI, supporting approximately 1GW of IT load. This role will drive contractor performance, field execution, sequencing, logistics, recovery planning, and construction turnover readiness for a high-impact, mission-critical data center campus. The position may be based remote within the U.S. with up to 50% travel to Saline, MI, or onsite/hybrid in Saline, MI.
Match this job to your CV
ApplySarthi scores your CV against this role, shows the skills you are missing, and writes a tailored version for the application.
Check my match →Similar open roles
- Senior Platform Software EngineerOracle · bengaluru
- Principal Core Infrastructure EngineerOracle · bengaluru
- Principal Network DeveloperOracle · bengaluru
- Senior Core Infrastructure EngineerOracle · bengaluru
- Lead Principal Core Infrastructure EngineerOracle · bengaluru
- Senior Network DeveloperOracle
- Principal Core Infrastructure EngineerOracle · bengaluru
- Senior Core Infrastructure EngineerOracle · bengaluru
Need answers during your interview? Try Live Sarthi.
Live Sarthi, an Interview Sarthi app, shows answer suggestions during the call.
- Hidden from supported screen sharingThe overlay stays out of supported Windows screen captures.
- Answers start in about 1.5 secondsResponse time varies with your connection and model.
- From your own CVYour projects and your experience, not a generic script.
- 30 minutes freeThen ₹149 for a 2-day pass with unlimited calls — you pay for the days you are interviewing, not a subscription.
A Windows app, from the same team as ApplySarthi.
Listed on oraclehcm · posted 2026-07-30. ApplySarthi collects openings and links to application pages; the role is advertised by Oracle, not by us.