Data Center Construction QA/QC Manager
Oracle
Make my CV for this job, freeView job and applyYour CV, rewritten for this role using only your real experience. Sign in with Google and upload your CV. Nothing to install.
This role on the market
563 open construction roles across 70 companies are on ApplySarthi right now, most of them in Hyderabad (6), Delhi NCR (5), Bengaluru (5).
- Sr. Construction Manager , HYDADSIPL - Telangana · hyderabad
- Construction Director, Data Centre Capacity DeliveryAmazon Corporate Services Pty Ltd
- Construction Estimator, AMER Estimating and Cost ControlAmazon Data Services, Inc.
- Project Controls Manager (Data Center Construction)Galaxy
- Construction Technician, Starbase Infrastructure SpaceX
What construction roles keep asking for: Excel (14%), AWS (13%) — counted across their open postings here.
Oracle has 2,214 open roles listed here.
- User Assistance Developer
- NetSuite Account Executive - Emerging Markets - Nashville, TN
- Program Manager 4
- Support Engineer
- NetSuite Account Executive - Emerging Markets - Austin, TX
Counted across 14 company job boards, updated as roles open and close.
Preparing for this interview
Interviews for construction roles keep coming back to Excel, AWS. Practise those questions before you sit with Oracle.
Questions you are likely to be asked
- Why do you want to join Oracle?
- What do you do when a developer says a bug is not a bug?
- How do you decide what to test when time is short?
- Tell me about a serious bug you caught before release. How did you find it?
- What would you automate first, and what would you keep manual?
Prep Sarthi gives you a free mock interview: an AI interviewer asks you questions like these out loud, from your own CV and this job, and shows your score and your weakest answer.
Practise the Data Center Construction QA/QC Manager at Oracle interview free →Assists in managing the construction of data centers by colocation providers, ensuring adherence to timelines, budgets, and quality standards. The ideal candidate has quality assurance / quality controls (QA/QC) experience and aspirations. This is an individual contributor role with no direct reports. Role is a full-time onsite position in Santa Teresa, NM and one must live in the area (!!!) This is Data Center Construction role!
Match this job to your CV
ApplySarthi scores your CV against this role, shows the skills you are missing, and writes a tailored version for the application.
Check my match →Similar open roles
- Data Centre Build EngineerOracle
- Principal Core Infrastructure EngineerOracle
- Principal Oracle Health Integration ArchitectOracle
- Senior Principal NetSuite Functional ConsultantOracle · bengaluru
- Oracle Fusion ERP Functional Consultant-FinanceOracle · bengaluru
- Senior Oracle Database Adminstation EngineerOracle
- Senior Core Infrastructure EngineerOracle
- Principal Core Infrastructure EngineerOracle · bengaluru
Need answers during your interview? Try Live Sarthi.
Live Sarthi, an Interview Sarthi app, shows answer suggestions during the call.
- Hidden from supported screen sharingThe overlay stays out of supported Windows screen captures.
- Answers start in about 1.5 secondsResponse time varies with your connection and model.
- From your own CVYour projects and your experience, not a generic script.
- 30 minutes freeThen ₹99 for a 2-day pass with unlimited calls — you pay for the days you are interviewing, not a subscription.
A Windows app, from the same team as ApplySarthi.
Listed on oraclehcm · posted 2026-06-12. ApplySarthi collects openings and links to application pages; the role is advertised by Oracle, not by us.